DOC - Permit Finaled | 6/20/2016 | 6/20/2016 | 6/20/2016 | P | PASS |
Andy J. Long
|
|
|
Construction complete. No loose material leaving site, BLD open for hand rail install only. ESC permit conditions satisfied.
|
Site Preparation | 12/7/2015 | 12/8/2015 | 12/8/2015 | P | PASS |
Andy J. Long
|
|
|
Randy Phone #: ###-####
Homeowner RP onsite. Project is in large backyard with existing vegetation. Access will be down the paved driveway so trackout should not be an issue.
Permit sign posted in front window. Approved.
|