Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberESC15-01560
StatusFinaled
Name TODD WAGGONER
Site Address 1601 N 5TH ST
Project NameSmall Addition
Customer Number 
ePlanReviewNo
Description
10'x12' cedar pengola, pour a 280"sf concrete
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final2/23/20162/23/20162/23/2016PPASS
DetailsAndy J. Long
Street and gutter cleaned thoroughly with broom, shovel, and power wash with water contaiment. No discharge beyond alley border observed. Temp sediment check dams removed.

ESC permit conditions satisfied.

Approved.
Site Final1/13/20161/19/20161/19/2016PPEND
DetailsAndy J. Long
Need to remove sandbag check dams and sweep street.
Site Final1/6/20161/13/20161/13/2016ANR
DetailsAndy J. Long
Required to have street sweeper and schedule Site Final

Project appears complete, temp BMPs installed will need removal and the streets swept as requested. No activity at site. No new trackout or violations. Will check back. Permit sign is posted visibly.
Site Final12/30/20151/6/20161/6/2016PNR
DetailsAndy J. Long
Complaint Inspection1/5/20161/5/20161/5/2016PFAIL
DetailsAndy J. Long
Complaint received about continued excessive trackout...

Both Sherman and 5th Street are dirty from work and appear to have broom swept. Requested that housekeeping improve, employees be trained and asked to limit trackout, and to have a street sweeper come once construciton is complete and to sweep Sherman between 5th and 6th streeet swept and 6th street between Ada and Sherman swept as a condition of the Site Final.

Tracking Control12/29/201512/30/201512/30/2015APEND
DetailsAndy J. Long
WIP. Trackout observed yesterday seems to have been cleaned up to a certain extent. Crew onsite currently putting in fence. Will check for final site clean up mid week. Site is frozen and difficult for thorough sweeping.
Tracking Control12/29/201512/29/201512/29/2015PFAIL
DetailsAndy J. Long
Significant amount of mud and dirt on street and sidewa observed at site during active construction.

This is after 2 warnings to keep clean were issued. Site Final inspection will be required with street sweeping required.

Will check conditions tomorrow to see if end of day cleaning/sweeping occured.
Complaint Inspection12/21/201512/21/201512/21/2015AFAIL
DetailsAndy J. Long
Muddy runoff down street.

Crews are working to clean mud off street currently. Requesting more cleanup, sandbag check dams