Site Final | 8/15/2016 | 8/15/2016 | 8/15/2016 | A | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and culdesace has been cleaned. Somerset Village temp BMPs to remain and inspected under ESC13-00193, no violations. No corrections needed.
|
General Inspection | 8/2/2016 | 8/2/2016 | 8/2/2016 | | PEND |
Evan Jenkins
|
|
|
Hillside SFH near completion. Landscaping/re-vegetation needs to become established
|
General Inspection | 7/15/2016 | 7/15/2016 | 7/15/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/13/2016 | 4/13/2016 | 4/13/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on frame. No trackout or sediment runoff to Sand Dune or Crestline. Trash contained. Approved.
|
Site Preparation | 2/9/2016 | 2/10/2016 | 2/10/2016 | A | PASS |
Andy J. Long
|
|
|
Need a ESC site pre-construction inspection. Phone #: ###-#### Inspection requested via web by SHANE JAYO
Aprroved for excavation
|