Site Final | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
Eric Story
|
|
|
site final ok
|
Aging Inspection | 7/21/2016 | 7/21/2016 | 7/21/2016 | | PEND |
Evan Jenkins
|
|
|
SFH complete Landscaping in progress. No ESC issues observed at this time
|
Site Preparation | 1/11/2016 | 1/12/2016 | 1/12/2016 | A | PASS |
Andy J. Long
|
|
|
Matt Phone #: ###-####
Permit sign posted. Storm drain for new culdesac has inlet bag installed with adequate capacity.
Lot has earthen berm around perimeter that is to be preserved in leiu of a silt fence along the north border. Adajacent property has a pond which has vegetative buffer that also must be undisturbed. Check next inspection.
RP to install construction fencing to keep workers from accessing lot from Skycrest Street.
Approved for construction.
|