Aging Inspection | 7/8/2016 | 7/8/2016 | 7/8/2016 | | PASS |
Andy J. Long
|
|
|
Home complete. All permits finaled. ESC conditions satisfied. Temp BMPs in Belmar to remain during active construction.
|
DOC - Permit Finaled | 7/8/2016 | 7/8/2016 | 7/8/2016 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | PASS |
Andy J. Long
|
|
|
Zack Phone #: ###-####
WIP. Reviewed ESC site prep requirements with Matt with Evans contsruction. No other corrections needed. BMPs for Belmar installed and sites clean.
|