Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberESC15-01612
StatusFinaled
Name BRYAN MURDOCH
Site Address 2955 E WINDSONG DR
Project NameBoulder Heights Lasher SFH
Customer Number 
ePlanReviewNo
Description
Hillside New Single Family Dwelling. ESC site plan and SWPPP reviewed and approved. Must be utilized and implemented on site before and during construction. Site preparation inspection REQUIRED, call 384-3802 to schedule. BMPs include sediment control perimeter wattle along sidewalk, construction entrance, permit signage, material management/containment onsite, and preservation of exisiting vegetation during construction as much as possible.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/26/20168/26/20168/26/2016PPASS
DetailsAndy J. Long
Temp BMP filter mat full of crusty dirt has been removed...revealing sediment filter bags. Will have BH#6 crew change out.

ESC permit condtions satisied, no further corrections. Lot vegetated/stabilized.
General Inspection8/17/20168/17/20168/17/2016 PEND
DetailsAndy J. Long
Need to remove filter mat on storm drain
Site Final7/22/20167/27/20167/28/2016ANR
DetailsAndy J. Long
Home is now complete and landscaping completed. Will monitor how the hydroseeded grass areas perform over the new few weeks. Need to sweep up loose rocks and dirt in gutter in front of home.
Aging Inspection7/22/20167/22/20167/22/2016 CANC
DetailsAndy J. Long
rescheduled for site final next week. Landscaping and final clean up is in progress.
Random Inspection5/19/20165/19/20165/19/2016PPART
DetailsAndy J. Long
Rain event and work on bank in front of house caused some sediment runoff from site.

RP shoveled mud and sweep dirt off of the sidewalk back to site.

Corrective action needed:
- clean out mud/sediment trapped at the sediment filter mat.
- change out filter mat
Random Inspection4/22/20164/22/20164/22/2016PPASS
DetailsAndy J. Long
WIP. Driving by and observed a hoist being used by roofers leaking oil. Called RP Bryan, who stated he would go to site and stabilize/absorb spill with saw dust and see if leak on machinery can be stopped or parked under drip pan.

RP notified me that next a stockpile haul off operation will occur so there may be incidental trackout that will be swept as needed.
BMP Violation3/25/20163/28/20163/29/2016PPASS
DetailsAndy J. Long
Follow up on corrections issued Friday

Corrections were made as requested:

1. Sidewalk and dirt ramp entrance in gutter was removed.
2. Sweeping performd around DI on Windsong
3. Driveway access has been prohibited and a wattle installed.
4. Loose trash and framing materials were picked up.
5. Section of wattle was installed for perimeter control where disturbed area abutts the sidewalk.
BMP Violation3/25/20163/25/20163/25/2016PFAIL
DetailsAndy J. Long
Multiple violations and lack of BMP issues at site. Corrective action required:

1. Install perimeter wattles along sidewalk per ESC plan. No vegetative buffer strip was left to contain sediment so need wattles or silt fence.
2. Pick up loose trash and debris
3. Re-sweep sidewalk, gutter, and
4. No construction entrance as indicated on ESC plan, block off entrance to vehicle and install sediment control. Remove mud and dirt on sidewalk from driveway.
5. Clean up dirt around storm drain and install new fiber sediment filter mat or filter bag.

Will check for corrections Monday afternoon. If corrections made, will need to escalate enforcement.
General Inspection3/2/20163/4/20163/8/2016APART
DetailsAndy J. Long
Dirt apron being used since curb isn't cut. Some trackout.

Correction:

- clean gutter in front of project. Sweep sidewalks.
- install perimeter sediment control at potential runoff discharg sites
Site Preparation1/19/20161/19/20161/19/2016PPASS
DetailsEvan Jenkins
Phone #: ###-####

Permit Posted: lot heavily vegetated. Contractor plans on leaving a large vegetated perimeter as his BMP. Will monitor throughout construction, and if any discharges begin to occur, contractor is to install perimeter BMP's.
Approved for construction at this time