Aging Inspection | 11/9/2016 | 11/9/2016 | 11/9/2016 | | PASS |
Andy J. Long
|
|
|
Townhome complete and landscaped. BLVD townhome projects still in progress, temp BmPs to remain installed
|
DOC - Permit Finaled | 11/9/2016 | 11/9/2016 | 11/9/2016 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 9/8/2016 | 9/8/2016 | 9/8/2016 | | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 3/22/2016 | 3/22/2016 | 3/22/2016 | P | PASS |
Andy J. Long
|
|
|
Joey Phone #: ###-####
Lined concrete washout to be relocated prior to foundation work. Lot is ready for excavation. Permit sign posted, active projects mostly in compliance with on duty RP. Storm drains have sediment filter bags.
|