Site Final | 4/18/2016 | 4/18/2016 | 4/18/2016 | P | PASS |
Andy J. Long
|
|
|
Call me 30 minutes prior if you would like me to meet you there. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
Trench for undergound electrical line has been patched over and loose sediment swept up. No materials, temp BMPs, or loose dirt on site. Permit conditions satisfied.
|
Site Preparation | 1/8/2016 | 1/11/2016 | 1/11/2016 | A | PASS |
Andy J. Long
|
|
|
Site is located behind D ; B. Call if you would like me to meet you there. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
Low risk site, self contained with existing pavement. Approved for construction.
|