Aging Inspection | 7/15/2016 | 7/15/2016 | 7/15/2016 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 7/15/2016 | 7/15/2016 | 7/15/2016 | P | PASS |
Evan Jenkins
|
|
|
Project Complete ESC Conditons Satisfied
|
Random Inspection | 2/29/2016 | 2/29/2016 | 2/29/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on framing for straw bale home. No trackout or dishcarges from site. Permit sign posted. No corrections needed at this time.
|
Site Preparation | 2/8/2016 | 2/8/2016 | 2/8/2016 | P | PASS |
Andy J. Long
|
|
|
Mark Phone #: ###-####
Permit sign posted. Inspection previously conducted. Trackout was cleaned up as requested. Approved. WIP
|
Tracking Control | 2/4/2016 | 2/4/2016 | 2/4/2016 | P | PART |
Andy J. Long
|
|
|
Trackout from dump truck on Franklin westbound to Pierce needs to be cleaned. Verbal correction request issued to homeowner RP. He agreed to clean up clods with shovel and sweep. I stated that a street sweeper would not be necessary.
Permit sign posted with contact details. No other issues.
|