Site Final | 7/18/2016 | 7/18/2016 | 7/18/2016 | P | PASS |
James Ady
|
|
|
site final ok
|
Site Preparation | 2/12/2016 | 2/12/2016 | 2/12/2016 | P | PART |
Evan Jenkins
|
|
|
Paul Phone #: ###-####
Concrete washoutt is 75% full and needs to be maintained and a new washout needs to be constructed. Contacted Clint Wall and Paul (RP) for this subdivision stating so. Both Clint and Paul stated they will get a new concrete washout constructed. Also significant trackout throughout project needs sweeping. Paul and Clint both stated they will get issues corrected.
|