Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC16-00035
StatusFinaled
Name ELDON OYADOMARI
Site Address 1075 E PARK BLVD
Project Name 
Customer Number 
ePlanReviewNo
Description
Idaho Power/Track Utilities working at Walnut and Park streets for underground utility replacement project. Using parking lot behind 1075 Park for stockpiling soils and staging equipment. Project in close proximity to River. All storm drains private and MS4 have inlet sediment bags installed. ESC plan submitted and approved. Work to be completed before the end of January. No dewatering activities listed. Removal of DI bags is required upon completion/stabilization.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/16/20165/16/20165/16/2016PDONE
DetailsEvan Jenkins
Call me 30 minutes prior if you would like to meet there. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
DOC - Permit Finaled5/16/20165/16/20165/16/2016PPASS
DetailsEvan Jenkins
project complete
esc conditions satisfied
Site Preparation1/8/20161/11/20161/11/2016APASS
DetailsAndy J. Long
Project is in construction (sorry about that). I spoke with Andy about this project. Let me know prior to the inspection if you would like to meet me there. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari

BMPs were installed prior to construction. Private storm drains and MS4 on Park Blvd have inlet filter bags. Stockpile is stored in middle of paved parking lot with perimeter controls. Approved.