DOC - Permit Finaled | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and occupied. Temp BMPs to remain during active SFH construction in Belmar. ESC conditions satisfied.
|
Site Preparation | 5/13/2016 | 5/13/2016 | 5/13/2016 | P | PASS |
Evan Jenkins
|
|
|
Paul Phone #: ###-####
Permit posted in front of flat lot next to current SFH construction. Approved for construction
|