Site Final | 8/16/2017 | 8/16/2017 | 8/16/2017 | A | PASS |
Andy J. Long
|
|
|
Parking lot, gutter, sidewalk, alley and intersection at Fairmeadow & Stonehaven has been swept. No temporary BMPs still installed. Site is landscaped/stabilized. ESC permit conditions satisfied.
|
General Inspection | 8/8/2017 | 8/9/2017 | 8/14/2017 | P | PEND |
Andy J. Long
|
|
|
|
BMP Violation | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PEND |
Andy J. Long
|
|
|
Project manager Ron from Vertical called to state that intersection of Fairmeadow and Stonehaven have been swept as well as gutter. Street sweeping will also be performed when landscaping is complete.
|
BMP Violation | 8/7/2017 | 8/8/2017 | 8/7/2017 | A | PEND |
Andy J. Long
|
|
|
Vertical 208 ###-####
|
Complaint Inspection | 8/7/2017 | 8/7/2017 | 8/7/2017 | P | FAIL |
Andy J. Long
|
|
|
Parking lot washed off with no sediment removal or sweeping.
Need to sweep gutter on Fairmeadow all the way to receiving storm drain.
|
General Inspection | 7/12/2017 | 7/12/2017 | 7/13/2017 | P | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 7/10/2017 | 7/10/2017 | 7/12/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/23/2017 | 5/23/2017 | 5/24/2017 | | PASS |
Melissa Jannusch
|
|
|
Perimeter controls are installed. WIP on renovation of the parking lot. No trackout on Fairview or Fair Meadow.
|
General Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 | A | PASS |
Andy J. Long
|
|
|
WIP on interior demolition & remodel. Selective demolition of curbing of previous use. Wattles installed around disturbed areas. No trackout or discharges. Dandy bag check dam placed in gutter since storm to capture sediment. Permit sign is posted.
|
General Inspection | 3/6/2017 | 3/6/2017 | 3/8/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/18/2017 | 1/18/2017 | 1/19/2017 | | CANC |
Andy J. Long
|
|
|
|