Site Final | 1/31/2017 | 1/31/2017 | 1/31/2017 | P | PASS |
Melissa Jannusch
|
|
|
Final vegetation implemented. No trash left on site. No trackout. Ok to final.
|
Aging Inspection | 12/28/2016 | 12/28/2016 | 12/28/2016 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 10/26/2016 | 10/26/2016 | 10/27/2016 | | PASS |
Andy J. Long
|
|
|
landscaping in progress. no violations. near completion. Multiple SFHs on Ghost Bar active. DIs protected. No trackout from open areas.
|
Aging Inspection | 8/26/2016 | 8/26/2016 | 8/26/2016 | | PASS |
Andy J. Long
|
|
|
WIP. DIs protected. Trackout on street is to be cleaned by developer of East Valley, see ESC15-00556
|
BMP Violation | 3/23/2016 | 3/23/2016 | 3/24/2016 | P | PEND |
Andy J. Long
|
|
|
Report of stockpiles placed on sidewalk and gutter for Tahoe Homes on Ghost Bar.....
Request to store backfill on a designated staging lot.
|
Site Preparation | 3/4/2016 | 3/7/2016 | 3/7/2016 | A | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Designated lined washout installed as requested for new home in the newly active phase of East Vallley. Permit sign posted. DIs have sediment protection. RP on duty. Approved.
|