Site Final | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
Aging Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 | | PASS |
Melissa Jannusch
|
|
|
Final landscaping is finished. Okay to final
|
Aging Inspection | 1/4/2017 | 1/4/2017 | 1/5/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 11/3/2016 | 11/3/2016 | 11/3/2016 | | PASS |
Ben Livingston
|
|
|
no track out..
|
General Inspection | 5/19/2016 | 5/19/2016 | 5/19/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. Flat lot. Vegetated perimeter with no surface water adajacent to site. Permit posted, construction entrance installed. No trackout or discharges.
|