Aging Inspection | 11/24/2016 | 11/24/2016 | 11/25/2016 | | PASS |
Andy J. Long
|
|
|
Work complete, all permits finaled. WIP in Park Place covered under ESC14-01083 . NO corrections needed.
|
DOC - Permit Finaled | 11/25/2016 | 11/25/2016 | 11/25/2016 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 5/12/2016 | 5/13/2016 | 5/13/2016 | A | PASS |
Andy J. Long
|
|
|
Inspection requested via web by Kyle Buzzell
Park Place townthome/condos are in progress. These 4 site preps are last 4 to start on the original phase of the project. Trash is contained, no windblown debris in park or Walling Creek area . Concrete washout pan is located on north side of Barber Station Dr. MS4 inlets have sediment filter bags installed and emptied every 2 weeks. RP Kyle onsite supervising.
|