Site Final | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
Jim Sly
|
|
|
|
Site Preparation | 3/28/2016 | 3/29/2016 | 3/29/2016 | A | PASS |
Evan Jenkins
|
|
|
Brandon Phone #: ###-####
Permit Posted in front of lot Concrete washout located in other phase of sub. Approved for Construction
|