Site Final | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
Aging Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 | | PASS |
Melissa Jannusch
|
|
|
Landscaping complete okay to final
|
General Inspection | 1/31/2017 | 1/31/2017 | 1/31/2017 | P | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 1/31/2017 | 1/31/2017 | 1/31/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP. Sign posted. Some trackout. Make sure trackout has not increased next inspection. DI bags in place
|
Site Preparation | 8/31/2016 | 8/31/2016 | 8/31/2016 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
BMPs installed; permit posted. Active projects in compliance. Approved.
|