Site Final | 9/23/2016 | 9/23/2016 | 9/23/2016 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | PASS |
Jim Sly
|
|
|
|
Site Preparation | 4/1/2016 | 4/1/2016 | 4/1/2016 | P | PASS |
Andy J. Long
|
|
|
Hi -- We need to schedule an Erosion Pre-Con meeting. Meeting will be with Steve Hanson ###-#### Phone #: ###-#### Inspection requested via web by Kim Winkle
Approved for construction. BMPs in place.
|