General Inspection | 6/4/2018 | 6/4/2018 | 6/4/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 4/17/2018 | 4/17/2018 | 4/17/2018 | | PASS |
Michael Zawacki
|
|
|
Building permit still open
|
General Inspection | 3/2/2018 | 3/2/2018 | 3/2/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/15/2018 | 1/15/2018 | 1/16/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/28/2017 | 11/28/2017 | 11/28/2017 | | PASS |
Michael Zawacki
|
|
|
WIP in interior. Site stabalized. Still have a trash box in use and port o pottie. When they are gone permit will be finaled.
|
General Inspection | 10/13/2017 | 10/13/2017 | 10/13/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/28/2017 | 8/28/2017 | 8/28/2017 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 7/11/2017 | 7/12/2017 | 7/13/2017 | P | NR |
Melissa Jannusch
|
|
|
WIP still ongoing on interior. Trash contained outside in parking lot. Can final once trash has been removed from exterior of building.
|
General Inspection | 7/11/2017 | 7/11/2017 | 7/11/2017 | | CANC |
Andy J. Long
|
|
|
rescheduled for final
|
Site Final | 5/22/2017 | 5/26/2017 | 5/26/2017 | A | NR |
Melissa Jannusch
|
|
|
Interior work in progress. Wood framed trash container for interior work still in parking lot along with some wood scraps. No other ESC issues. Okay to final once trash bin is removed.
|
General Inspection | 5/22/2017 | 5/22/2017 | 5/22/2017 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final. all other permits finaled.
|
General Inspection | 4/4/2017 | 4/4/2017 | 4/4/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/17/2017 | 2/17/2017 | 2/21/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 1/2/2017 | 1/2/2017 | 1/3/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/30/2016 | 9/30/2016 | 9/30/2016 | | PASS |
Andy J. Long
|
|
|
No activity. Project not yet complete, interior work remaining. No violations.
|
General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | PASS |
Andy J. Long
|
|
|
Exterior of commercial building is complete and has been recentely landscaped. Only the shell is complete, inside work ongoing. No trackout, uncontained debris, or other violations.
Will need to give parking lot/staging area a final sweeping before removal of DI bag on the private onsite storm drain.
|
General Inspection | 4/6/2016 | 4/6/2016 | 4/6/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation. Clean site, no trackout. Vegetation on north side of project preserved. Permit sign posted. Approved.
|