Site Final | 11/2/2016 | 11/8/2016 | 11/8/2016 | A | PASS |
Andy J. Long
|
|
|
Blvd. townhome complete and landscaped. DI bags in area to be removed as blocks completed. BLD finaled, no ESC corrections needed. Active projects in compliance.
|
Aging Inspection | 11/2/2016 | 11/2/2016 | 11/2/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final 9/8
|
Site Preparation | 4/27/2016 | 4/28/2016 | 4/28/2016 | P | PASS |
Andy J. Long
|
|
|
Joey Phone #: ###-####
Permit signs posted, lined concrete washout is ready for next block of townhomes. DI bags installed in alleys and on Parkcenter Blvd. Active projects are in compliance. Approved.
|