Site Final | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | PASS |
Andy J. Long
|
|
|
Construction complete and DI bags removed on corner of Wright and Cadet. Yard is landscaped and stabilized.
|
Site Preparation | 3/15/2016 | 3/15/2016 | 3/15/2016 | P | PASS |
Evan Jenkins
|
|
|
Permit posted on wooden fence alond Cadet. Perimeter waddle installed along the east/north side of project approved for construction
|