Site Final | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
Aging Inspection | 6/5/2017 | 6/5/2017 | 6/6/2017 | | PASS |
Melissa Jannusch
|
|
|
Landscaping complete okay to final.
|
Site Final | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | FAIL |
Melissa Jannusch
|
|
|
Sweep up street and remove DI bag before site final can be completed
|
Aging Inspection | 4/4/2017 | 4/4/2017 | 4/4/2017 | | PASS |
Melissa Jannusch
|
|
|
Landscaping in progress
|
General Inspection | 1/31/2017 | 1/31/2017 | 1/31/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP. Sign posted. Some trackout. Make sure track out has not increased next inspection. DI bags in place.
|
Aging Inspection | 1/18/2017 | 1/18/2017 | 1/23/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 11/17/2016 | 11/17/2016 | 11/17/2016 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 5/10/2016 | 5/10/2016 | 5/10/2016 | P | PASS |
Evan Jenkins
|
|
|
Clint Phone #: ###-####
Permit Posted Approved for construction on flat lot
|