DOC - Permit Finaled | 11/23/2016 | 11/23/2016 | 11/23/2016 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 11/23/2016 | 11/23/2016 | 11/23/2016 | | PASS |
Andy J. Long
|
|
|
Park Place unit complete, occupied and landscaped. No temporary BMP removal due to ongoing construction activity. ESC permit finaled
|
Aging Inspection | 9/22/2016 | 9/22/2016 | 9/22/2016 | | PART |
Andy J. Long
|
|
|
WIP. Not yet landscaped around edges and back side. Park Place BMPs installed including DI bags, trash containement, and designated washout container.
Correction request to RP to have staging area across street cleaned up (waste materials moved, dried washout piles) to prevent further dumping and misuse of washout that is provided.
|
Site Preparation | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PASS |
Andy J. Long
|
|
|
Inspection requested via web by Kyle Buzzell
Approved for construction.
Storm drain inlets have filter bags that are in good condition. A new lined washout box has bee provided for new foundations on southwest side of Frontrunner.
Walked the swale in the park, no windblown trash or debris issues, outlets from the site's stormwater treatment system are fairly clean.
Weekly sweeping and frequent trash haul off should continue.
|