Information based on query as of Saturday, June 22, 2024.
Permit Information
Permit NumberESC16-00288
StatusFinaled
Name CLAYTON BROOKS
Site Address 2996 E WINDSONG DR
Project NameSimmonds Residence
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 4362 sq. ft., two story (below grade level 1651 sq. ft., at grade/first story 2711 sq. ft.) single family dwelling with 4 bedrooms, 2 full bathrooms, 2 half bathrooms, approximately *** sq. ft. of covered patio/porch and a 1073 sq. ft. attached garage
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final9/19/20179/22/20179/28/2017PCANC
DetailsAndy J. Long
Site Final9/28/20179/28/20179/28/2017PPASS
DetailsAndy J. Long
SFH construction complete. Contractor no longer on site, BLD finaled. Work continues on pool and landscaping, see ESC17-00735
General Inspection9/19/20179/19/20179/19/2017 CANC
DetailsAndy J. Long
General Inspection9/4/20179/4/20179/5/2017 CANC
DetailsAndy J. Long
General Inspection8/18/20178/18/20178/18/2017 CANC
DetailsAndy J. Long
General Inspection8/3/20178/3/20178/4/2017 CANC
DetailsAndy J. Long
General Inspection7/19/20177/19/20177/21/2017 CANC
DetailsAndy J. Long
General Inspection7/4/20177/4/20177/5/2017 PASS
DetailsMelissa Jannusch
WIP. Trash contained. No corrections issued.
General Inspection6/19/20176/19/20176/19/2017 CANC
DetailsMelissa Jannusch
General Inspection6/2/20176/2/20176/2/2017 PASS
DetailsAndy J. Long
WIP on exterior finish. No activity at time of inspection. No trackout or significant amounts of loose sediment/debris in sidewalk and gutter. Receiving storm drains have maintained DI ags. Permit sign posted. Approved.
General Inspection5/18/20175/18/20175/19/2017 PASS
DetailsMelissa Jannusch
Finishing touches. Next inspection should be ready for site final.
General Inspection5/3/20175/3/20175/3/2017PPASS
DetailsMelissa Jannusch
WIP on interior and exterior. DI bags are okay but could use maintenance soon. Some waste on site make sure this is cleaned up before site final.
General Inspection4/26/20174/26/20174/28/2017 CANC
DetailsAndy J. Long
General Inspection4/11/20174/11/20174/11/2017 CANC
DetailsAndy J. Long
General Inspection3/27/20173/27/20173/27/2017 PASS
DetailsMelissa Jannusch
Trackout cleaned up. No windblown trash. Project ok. No corrections requested.
General Inspection3/10/20173/10/20173/10/2017 PASS
DetailsMelissa Jannusch
DI protection installed. okay
General Inspection2/21/20172/23/20172/24/2017APASS
DetailsMelissa Jannusch
Corrections addressed: have cleaned trackout and trash. BMPs maintained.
Site Preparation2/15/20172/22/20172/21/2017PCANC
DetailsMelissa Jannusch
BMP Violation2/8/20172/15/20172/15/2017PPART
DetailsMelissa Jannusch
Corrections addressed: Pick up windblown construction wrappings on downhill side of home, reinstall perimeter sediment control along sidewalk
Corrections not addressed: Sweep sidewalk, conduct maintenance on DI sediment bags
Additional corrections requested: empty trash, pick up trash on site
Left message with RP Clayton Brooks requesting corrections.
General Inspection2/8/20172/8/20172/8/2017PFAIL
DetailsAndy J. Long
Corrections needed:

1. Sweep sidewalk and gutter to remove dirt clods
2. Conduct maintenance on DI sediment bags
3. Pick up windblown construction wrappings on downhill side of home.
4. Reinstall permeter sediment control along sidewalk

Note: stabilized construction loading area provided, no discharges at time of inspection, permit sign posted.

General Inspection2/2/20172/2/20172/3/2017 CANC
DetailsAndy J. Long
General Inspection1/3/20171/3/20171/4/2017 CANC
DetailsAndy J. Long
General Inspection12/16/201612/16/201612/21/2016 CANC
DetailsAndy J. Long
General Inspection12/1/201612/1/201612/2/2016 PASS
DetailsAndy J. Long
WIP. Sidewalks and gutters have been swept. Perimeter control wattle installed. No discharges or un
General Inspection11/16/201611/16/201611/18/2016 PART
DetailsAndy J. Long
Active grading and earth work in progress. No discharges, permit posted.

Corrections needed next week:
- sweep up sidewalk and gutter.
- check inlet sediment control for maintenance
- re-install perimeter wattles removed for machinery access.
General Inspection11/1/201611/1/201611/1/2016APASS
DetailsAndy J. Long
WIP. ESC foreman on site sweeping regularly and checking BMPs. Perimeter wattle installed, rock construction entrance provided. Approved.
General Inspection10/20/201610/20/201610/20/2016 PASS
DetailsAndy J. Long
WIP on foundation and backfill. Perimeter wattle installed, permit sign posted, MS4 inlet protection. Site was shut down during rains earlier in the week to prevent trackout and other isssues.
General Inspection10/5/201610/5/201610/6/2016 PART
DetailsAndy J. Long
Permit sign posted, down hill MS4 inlet on Windsong has sediment filter bags installed. Sidewalk, street and gutter have been swept though stain from concrete truck is visible. Needs further sweeping.

Perimeter control wattles installed at edge of pavement and on down hill side of lot. Concrete washout was utilized.

Correction request:
sweep up sediment and rocks in gutter, work on spill clean up.
General Inspection9/20/20169/20/20169/21/2016 PASS
DetailsAndy J. Long
WIP on foundation work. BMPs installed (perimeter wattles, permit sign, washout) Road has been swept. No corrections at this time.
General Inspection8/30/20168/31/20169/2/2016PPASS
DetailsAndy J. Long
Sidewalk, street and gutter have been swept clean. Perimeter wattles re-installed. No trackout or discharges observed. Permit sign posted.

Site is back in compliance, approved.
BMP Violation8/29/20168/30/20168/30/2016PPART
DetailsAndy J. Long
RP working on cleaning up site after notification on non-compliance. Follow up scheduled for tomorrow.
BMP Violation8/26/20168/29/20168/29/2016PCANC
DetailsAndy J. Long
General Inspection8/26/20168/26/20168/26/2016PFAIL
DetailsAndy J. Long
Need to sweep sidewalk, gutter, and street in front of project. No other violations and site did clear site prep inspection previously. Inspectio scheduled for Monday 8/29
General Inspection1/18/20171/18/2017   
DetailsMelissa Jannusch