Site Final | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Andy J. Long
|
|
|
Home is complete, landscaped & stabilized. Culdesac, sidewalk and gutter have been swept clean. No other actions required, ESC permit conditions satisfied.
|
General Inspection | 6/23/2016 | 6/23/2016 | 6/23/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. No trackout or non-stormwater discharges., trash container has capacity..
Some trash across street blown by wind should be picked up this week.
|
Site Preparation | 3/29/2016 | 3/29/2016 | 3/29/2016 | P | PASS |
Evan Jenkins
|
|
|
Bryan Phone #: ###-####
Permit posted on porta pot infront of flat lot. Approved for construction
|