Site Final | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | PASS |
Jim Sly
|
|
|
|
Aging Inspection | 2/8/2017 | 2/8/2017 | 2/8/2017 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 12/7/2016 | 12/8/2016 | 12/8/2016 | A | NR |
Andy J. Long
|
|
|
Inspection requested via web by Chris Laraway Storm drains in front of house at Woodland & Kimball still have the temporary sediment control inlet filter bags installed.
|
Site Final | 10/10/2016 | 10/10/2016 | 10/10/2016 | A | NR |
Andy J. Long
|
|
|
Home is complete and landscaped. No sediment or other material leaving site.
Ready for ESC final when 2 x DI bags on Woodland are removed. Only two open ESC permits on Woodland now, only 1 remaining lot.
Request issued to Chris with Evergreen
|
Site Preparation | 9/28/2016 | 9/28/2016 | 9/28/2016 | P | PASS |
Tom Saunders
|
|
|
jobsite complete...ok to final
|
General Inspection | 6/13/2016 | 6/13/2016 | 6/13/2016 | A | PASS |
Andy J. Long
|
|
|
follow up BMP violation inspection
Clean up requested has been completed. DI bags on both sides of street were cleaned out and re-installed. Concrete waste pile removed.
Site is back in compliance.
|
General Inspection | 6/8/2016 | 6/10/2016 | 6/13/2016 | A | CANC |
Andy J. Long
|
|
|
follow up on correction request from 6/8
|
BMP Violation | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | FAIL |
Andy J. Long
|
|
|
Uncontained washout and slurry needs to be cleaned. DI bag at intersection needs maintenance.
RP Chris stated his crew will address the issue. Will reinspect Friday AM.
|
Site Preparation | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | PASS |
Evan Jenkins
|
|
|
Clarence Phone #: ###-####
Permit Posted and BMP's in place Approved for construction
|