Site Final | 10/14/2016 | 10/19/2016 | 10/19/2016 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and occupied. BLD finaled, no temp BMP removal.
|
DOC - Permit Finaled | 10/19/2016 | 10/19/2016 | 10/19/2016 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 10/14/2016 | 10/14/2016 | 10/14/2016 | | CANC |
Andy J. Long
|
|
|
|
BMP Violation | 4/15/2016 | 4/15/2016 | 4/15/2016 | P | PART |
Andy J. Long
|
|
|
Report of messy site without permit...
No trackout to Five Mile, no employees driving on the dirt. Flat site, no surface water, & vegetated perimeter.
- clearly post permit (said to be on porta-pot) - contain concrete washout on site. - provide trash bin for employee and construction waste to prevent wind blown litter
|
Site Preparation | 4/13/2016 | 4/13/2016 | 4/13/2016 | P | PART |
Mike Jordan
|
|
|
Needs to post ESC permit sign.
|