Site Final | 2/1/2017 | 2/1/2017 | 2/1/2017 | P | PASS |
Melissa Jannusch
|
|
|
okay to final.
|
General Inspection | 1/30/2017 | 1/30/2017 | 2/1/2017 | | PASS |
Melissa Jannusch
|
|
|
Building finaled. Vegetation mature. Soil stabilized. No trackout or trash left. Okay to final
|
General Inspection | 1/13/2017 | 1/13/2017 | 1/13/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/29/2016 | 12/29/2016 | 12/30/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/5/2016 | 12/14/2016 | 12/15/2016 | P | PASS |
Andy J. Long
|
|
|
Near completion. Frame complete, WIP on interior. BLD open. No correcitons.
|
General Inspection | 12/5/2016 | 12/5/2016 | 12/5/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/18/2016 | 11/18/2016 | 11/18/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/3/2016 | 11/3/2016 | 11/3/2016 | | PASS |
Ben Livingston
|
|
|
|
General Inspection | 10/19/2016 | 10/19/2016 | 10/20/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/23/2016 | 9/23/2016 | 9/26/2016 | | CANC |
Andy J. Long
|
|
|
|