DOC - Permit Finaled | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 10/7/2016 | 10/7/2016 | 10/7/2016 | | PASS |
Andy J. Long
|
|
|
Project complete. Yard is landscaped/stabilized. All permits finaled, no ESC corrections needed.
|
Site Preparation | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | PASS |
Andy J. Long
|
|
|
Brad Phone #: ###-####
Zach Evans SFH in Belmar approved for construction. BMPs installed. Active sites are clean with trash contained. Lined concrete washouts being shared by ZEC and Tahoe
|