Site Final | 8/31/2016 | 9/2/2016 | 9/2/2016 | A | PASS |
Andy J. Long
|
|
|
SFH complete. Yard is landscaped. Jayo Construction will remove all remaining temp BMPs under seperate active SFH permit ESC 16-01087
|
DOC - Permit Finaled | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Andy J. Long
|
|
|
|
Site Final | 8/15/2016 | 8/31/2016 | 8/31/2016 | A | NR |
Andy J. Long
|
|
|
rescheduled
|
Site Final | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | NR |
Andy J. Long
|
|
|
Need to remove temp BMPs and concrete waste in the alley.
|
Site Preparation | 4/11/2016 | 4/12/2016 | 4/12/2016 | A | PASS |
Andy J. Long
|
|
|
Cameron Phone #: ###-####
Permit sign posted. Sediment protection installed on receiving storm drain. Active projects are in compliance and clean. Approved for construction.
|