Permit Information
Permit NumberESC16-00399
StatusFinaled
Name MICHELLE AMES
Site Address 2800 S MAPLE GROVE RD
Project NameMaple Grove Elementary Imp.
Customer Number 
ePlanReviewNo
Description
(MAPLE GROVE ELEMENTARY PARKING) - Grading permit to pave existing lot, work to include asphalt paving, landscaping, site lighting improvements, & storm water management
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection3/2/20183/2/20183/2/2018 PASS
DetailsAndy J. Long
Work complete. No disturbed area, loose materials, construction activity, nor temp. BMPs on site. ESC permit finaled.
DOC - Permit Finaled3/2/20183/2/20183/2/2018PPASS
DetailsAndy J. Long
General Inspection1/15/20181/15/20181/16/2018 CANC
DetailsAndy J. Long
General Inspection11/28/201711/28/201711/28/2017 PASS
DetailsMichael Zawacki
No issues observed.
General Inspection10/13/201710/13/201710/13/2017 PEND
DetailsAndy J. Long
revegetation
General Inspection8/28/20178/28/20178/30/2017 CANC
DetailsAndy J. Long
General Inspection7/11/20177/11/20177/11/2017 CANC
DetailsAndy J. Long
General Inspection5/26/20175/26/20175/26/2017 PASS
DetailsMelissa Jannusch
No ESC issues observed.
General Inspection4/10/20174/10/20174/11/2017 CANC
DetailsMelissa Jannusch
General Inspection2/21/20172/21/20172/21/2017 PASS
DetailsMelissa Jannusch
No corrections
General Inspection1/4/20171/4/20171/5/2017 CANC
DetailsAndy J. Long
General Inspection11/18/201611/18/201611/18/2016 CANC
DetailsAndy J. Long
General Inspection9/30/20169/30/20169/30/2016 PASS
DetailsAndy J. Long
BMP Violation7/21/20167/21/20167/21/2016PPART
DetailsAndy J. Long
No major trackout, discharges or fugitive dust issues at site. Permit sign is posted.

No pre-construction "site preparation" inspection requested.

Correction request:
- no construction entrance, install stabilized entrance or sweep apron to Maple Grove daily until parking lot is paved.
- provide trash container for workers.
- ensure concrete contractors are using a leak-proof washout.

VM left with RP - will see for call back to set compliance date