Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberESC16-00430
StatusFinaled
Name DAVE PERKINS
Site Address 8485 W USTICK RD
Project NameCity of Boise Fire Station 4
Customer Number 
ePlanReviewNo
Description
**Project Management-Ron Hill** **GREEN TAG EXPIDITED REVIEW - Review to 2012 IgCC** (CITY OF BOISE - Fire Station #4) Permit to construct a new 13,774 square foot Fire Station. New construction for Fire Station 4
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final7/3/20177/3/20177/3/2017PPASS
DetailsAndy J. Long
No ESC corrections needed at site. Fire station #4 is complete with temp. occupancy. Site is landscaped, storm drainage system installed with south swale hydroseeded and with supplemental irrigation. MS4 on Ustick has had inlet protect removed. ESC permit conditions satisfied.
General Inspection6/20/20176/20/20176/20/2017 PASS
DetailsAndy J. Long
General Inspection6/5/20176/5/20176/5/2017 CANC
DetailsAndy J. Long
General Inspection5/19/20175/19/20175/19/2017 CANC
DetailsAndy J. Long
General Inspection5/4/20175/4/20175/4/2017 PASS
DetailsAndy J. Long
Project near completion. In progress of paving entrance and front area of Fire Station. No trackout or discharges observed. No fugitive dust.
General Inspection4/19/20174/19/20174/19/2017 PASS
DetailsMelissa Jannusch
No ESC issues observed.
General Inspection4/4/20174/4/20174/4/2017 PASS
DetailsAndy J. Long
No trackout to Ustick. Building structure is complete, site work in progress. Will need to make sure they remove temp DI bag upon stabilization. NO corrections at this time.
General Inspection3/20/20173/20/20173/23/2017 CANC
DetailsAndy J. Long
General Inspection3/3/20173/3/20173/3/2017 PASS
DetailsAndy J. Long
WIP. Construction entrance in good condition. No trackout, discharges, or loose dirt on sidewalk observed.
General Inspection2/16/20172/16/20172/16/2017PPASS
DetailsMelissa Jannusch
Met with RP (Dave) on site. Has sweeper coming for trackout onto Ustick. Is making a new construction entrance. Plans to fix wattles.
General Inspection2/14/20172/14/20172/16/2017 PASS
DetailsMelissa Jannusch
Stabilization achieved. WIP on adjacent townhomes. Okay to final.
General Inspection1/30/20171/30/20172/6/2017 CANC
DetailsAndy J. Long
General Inspection1/13/20171/13/20171/13/2017 CANC
DetailsAndy J. Long
General Inspection12/29/201612/29/201612/29/2016 CANC
DetailsAndy J. Long
General Inspection12/14/201612/14/201612/15/2016 CANC
DetailsAndy J. Long
General Inspection11/29/201611/29/201611/29/2016 PASS
DetailsAndy J. Long
General Inspection11/11/201611/11/201611/15/2016 CANC
DetailsAndy J. Long
Tracking Control10/26/201610/27/201610/28/2016ACANC
DetailsAndy J. Long
General Inspection10/25/201610/25/201610/26/2016 PART
DetailsAndy J. Long
Trackout observed to Ustick from site. Construction entrance inadequate for heavy equipment traffic. Tracking control inspection scheduled.
General Inspection10/10/201610/10/201610/10/2016PPASS
DetailsAndy J. Long
Permit sign posted. Construction entrance and perimeter sediment controls installed. No trackout or discharges. Approved.
General Inspection9/20/20169/20/20169/20/2016PPASS
DetailsAndy J. Long
WIP. MS4 inlets have sediment protection. No trackout, fugitive dust, or discharges observed. Permit sign is posted.
General Inspection8/26/20168/26/20168/26/2016PPASS
DetailsEvan Jenkins
work in progress
General Inspection8/8/20168/8/20168/8/2016PPASS
DetailsAndy J. Long
WIP. Rock construction installed, DI protection on Ustick. No trackout, no fugitve dust observed. Site surrounded by construction fencing. No corrections.