Site Final | 7/3/2017 | 7/3/2017 | 7/3/2017 | P | PASS |
Andy J. Long
|
|
|
No ESC corrections needed at site. Fire station #4 is complete with temp. occupancy. Site is landscaped, storm drainage system installed with south swale hydroseeded and with supplemental irrigation. MS4 on Ustick has had inlet protect removed. ESC permit conditions satisfied.
|
General Inspection | 6/20/2017 | 6/20/2017 | 6/20/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/5/2017 | 6/5/2017 | 6/5/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/4/2017 | 5/4/2017 | 5/4/2017 | | PASS |
Andy J. Long
|
|
|
Project near completion. In progress of paving entrance and front area of Fire Station. No trackout or discharges observed. No fugitive dust.
|
General Inspection | 4/19/2017 | 4/19/2017 | 4/19/2017 | | PASS |
Melissa Jannusch
|
|
|
No ESC issues observed.
|
General Inspection | 4/4/2017 | 4/4/2017 | 4/4/2017 | | PASS |
Andy J. Long
|
|
|
No trackout to Ustick. Building structure is complete, site work in progress. Will need to make sure they remove temp DI bag upon stabilization. NO corrections at this time.
|
General Inspection | 3/20/2017 | 3/20/2017 | 3/23/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 | | PASS |
Andy J. Long
|
|
|
WIP. Construction entrance in good condition. No trackout, discharges, or loose dirt on sidewalk observed.
|
General Inspection | 2/16/2017 | 2/16/2017 | 2/16/2017 | P | PASS |
Melissa Jannusch
|
|
|
Met with RP (Dave) on site. Has sweeper coming for trackout onto Ustick. Is making a new construction entrance. Plans to fix wattles.
|
General Inspection | 2/14/2017 | 2/14/2017 | 2/16/2017 | | PASS |
Melissa Jannusch
|
|
|
Stabilization achieved. WIP on adjacent townhomes. Okay to final.
|
General Inspection | 1/30/2017 | 1/30/2017 | 2/6/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/13/2017 | 1/13/2017 | 1/13/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/29/2016 | 12/29/2016 | 12/29/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/14/2016 | 12/14/2016 | 12/15/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/29/2016 | 11/29/2016 | 11/29/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/11/2016 | 11/11/2016 | 11/15/2016 | | CANC |
Andy J. Long
|
|
|
|
Tracking Control | 10/26/2016 | 10/27/2016 | 10/28/2016 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/25/2016 | 10/25/2016 | 10/26/2016 | | PART |
Andy J. Long
|
|
|
Trackout observed to Ustick from site. Construction entrance inadequate for heavy equipment traffic. Tracking control inspection scheduled.
|
General Inspection | 10/10/2016 | 10/10/2016 | 10/10/2016 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted. Construction entrance and perimeter sediment controls installed. No trackout or discharges. Approved.
|
General Inspection | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. MS4 inlets have sediment protection. No trackout, fugitive dust, or discharges observed. Permit sign is posted.
|
General Inspection | 8/26/2016 | 8/26/2016 | 8/26/2016 | P | PASS |
Evan Jenkins
|
|
|
work in progress
|
General Inspection | 8/8/2016 | 8/8/2016 | 8/8/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. Rock construction installed, DI protection on Ustick. No trackout, no fugitve dust observed. Site surrounded by construction fencing. No corrections.
|