DOC - Permit Finaled | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped and stabilized. No further ESC actions needed. Permit finaled.
|
Site Preparation | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | PASS |
Andy J. Long
|
|
|
Matt Phone #: ###-####
Zach Evans SFH in Belmar approved for construction. BMPs installed. Active sites are clean with trash contained. Lined concrete washouts being shared by ZEC and Tahoe
|