Site Final | 10/31/2016 | 10/31/2016 | 10/31/2016 | P | PASS |
Andy J. Long
|
|
|
Constrction complete. Disturbed area stabilized. Temporary BMPs (inlet bags) have been removed; no loose materials remaining on site. ESC permit conditions satisfied.
|
Random Inspection | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PASS |
Andy J. Long
|
|
|
Gas station canopy and site improvements complete and pumps now in use. Site has been swept and cleaned, no construction materials onsite. DI bag installed on Jackson's private inlet, will suggest they remove and re-use for next project....
|
General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. New Crane Creek canal cover has been installed. No trackout or discharges. Surface of water no longer exposed. Permit sign posted on fence. Lined concrete washout was utilized. Site is in compliance.
|
General Inspection | 8/26/2016 | 8/26/2016 | 8/26/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. No trackout. Concrete washout pan being utilized. Permit sign posted on fence. Site is in compliance.
|
General Inspection | 7/27/2016 | 7/27/2016 | 7/27/2016 | P | PASS |
Andy J. Long
|
|
|
check Crane Creek culvert work - refered by ACHD inspector
WIP. No violations. Will be replacing Crane Creek concrete cover once site work for stormwater and utilities is complete. No debris or sediment going into creek, which is at very low flow. Requested that edges of pavement around exposed portion be swept
|
Site Preparation | 7/11/2016 | 7/13/2016 | 7/12/2016 | A | PASS |
Evan Jenkins
|
|
|
Phone #: 9892465 >> Inspection requested via mobile web by Brad
Witches hats installed, permit posted on building. Once building is Demoed, permit will be posted on adjacent fence. Approved to begin construction. --Contractor meant for Site prep to be today, not tomorrow
|