Site Final | 5/24/2017 | 5/24/2017 | 5/24/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
Aging Inspection | 5/24/2017 | 5/24/2017 | 5/24/2017 | | PASS |
Melissa Jannusch
|
|
|
Soil is stable okay to final.
|
Aging Inspection | 3/22/2017 | 3/22/2017 | 3/22/2017 | | PASS |
Melissa Jannusch
|
|
|
Building is complete. Stabilization has not been achieved. Not ready to final.
|
Aging Inspection | 1/20/2017 | 1/20/2017 | 1/26/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/22/2016 | 8/22/2016 | 8/22/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on frame. Trash contained, lined washout box provided, & permit sign posted. Street and sidewalk have been swept regularly. Clean site, no violations. Approved.
|
Tracking Control | 7/12/2016 | 7/14/2016 | 7/15/2016 | P | PASS |
Evan Jenkins
|
|
|
check that roadways are free of loose dirt from loading activity; or that sweeping has occured.
Trackout has been swept
|
Random Inspection | 7/12/2016 | 7/12/2016 | 7/12/2016 | P | PART |
Andy J. Long
|
|
|
Verbal request to improve street sweeping.
|