Site Final | 5/23/2017 | 5/23/2017 | 5/23/2017 | P | PASS |
Melissa Jannusch
|
|
|
Landscaping complete. Okay to final.
|
General Inspection | 5/23/2017 | 5/23/2017 | 5/23/2017 | | PASS |
Melissa Jannusch
|
|
|
Landscaping complete. Okay to final.
|
General Inspection | 5/8/2017 | 5/8/2017 | 5/10/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/21/2017 | 4/21/2017 | 4/21/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/6/2017 | 4/6/2017 | 4/7/2017 | | PASS |
Melissa Jannusch
|
|
|
Retaining wall has been built along sidewalk. This should prevent soil from leaving the site. WIP on the basement. No trackout onto street.
|
General Inspection | 3/22/2017 | 3/22/2017 | 3/22/2017 | | PASS |
Melissa Jannusch
|
|
|
No trackout. Dirt is not spilling onto sidewalk. No corrections requested. Project ok.
|
General Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 | | PASS |
Melissa Jannusch
|
|
|
No ESC violations. Final landscaping not yet achieved
|
Tracking Control | 2/13/2017 | 2/20/2017 | 2/21/2017 | P | PASS |
Melissa Jannusch
|
|
|
Okay.
|
General Inspection | 2/13/2017 | 2/13/2017 | 2/13/2017 | | PART |
Melissa Jannusch
|
|
|
Track out onto side walk. Wattle has moved onto sidewalk. Permit sign not visible. Staked permit sign in front yard. Called RP and left a message requesting corrections Corrections requested: Sweep up sidewalk, Re-install and/or replace perimeter wattle Follow up scheduled: 2/20
|
General Inspection | 1/27/2017 | 1/27/2017 | 1/30/2017 | | PASS |
Melissa Jannusch
|
|
|
Snow covered conditions. Building appears to be nearly complete. No track out trash contained. Have started work on lot next door will continue once conditions improve.
|
General Inspection | 1/12/2017 | 1/12/2017 | 1/17/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/28/2016 | 12/28/2016 | 12/30/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/9/2016 | 12/13/2016 | 12/20/2016 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/7/2016 | 12/7/2016 | 12/9/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/22/2016 | 11/22/2016 | 11/25/2016 | | PASS |
Ben Livingston
|
|
|
waddel has been removed, new foundation being dug , there is alittle trac out but was cleaned up
|
General Inspection | 11/3/2016 | 11/3/2016 | 11/3/2016 | | PASS |
Daryl Spivey
|
|
|
Waddle in place, no trackout and garbage in container............ds
|
General Inspection | 10/19/2016 | 10/19/2016 | 10/20/2016 | A | PASS |
Andy J. Long
|
|
|
WIP. Frame is complete and stucco crew onsite. GC George onsite. Perimeter wattle installed at edge of pavement. No trackout, spills, or other issue. Trash container provided. Approved.
|
BMP Violation | 8/12/2016 | 8/15/2016 | 8/15/2016 | A | FAIL |
Evan Jenkins
|
|
|
Per EEJ Phone #: ###-####
Verbal correction notice to RP Charlie, to remove construction debris that laying all around the project, sweep sediment off sidewalk and install a BMP (straw waddle) along front of project. will follow up tomorrow to ensure compliance has been achieved.
|