Permit Information
Permit NumberESC16-00499
StatusFinaled
Name CHARLEY COOPER
Site Address 3626 N LA FONTANA WAY
Project Name3626 LA FONTANA WAY
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 3,378 sq. ft., two story with a basement (first story 1,340 sq. ft., second story 1,396 sq. ft., basement level 642 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately *** sq. ft. of covered patio/porch and a *** sq. ft. attached garage
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/23/20175/23/20175/23/2017PPASS
DetailsMelissa Jannusch
Landscaping complete. Okay to final.
General Inspection5/23/20175/23/20175/23/2017 PASS
DetailsMelissa Jannusch
Landscaping complete. Okay to final.
General Inspection5/8/20175/8/20175/10/2017 CANC
DetailsAndy J. Long
General Inspection4/21/20174/21/20174/21/2017 CANC
DetailsAndy J. Long
General Inspection4/6/20174/6/20174/7/2017 PASS
DetailsMelissa Jannusch
Retaining wall has been built along sidewalk. This should prevent soil from leaving the site. WIP on the basement. No trackout onto street.
General Inspection3/22/20173/22/20173/22/2017 PASS
DetailsMelissa Jannusch
No trackout. Dirt is not spilling onto sidewalk. No corrections requested. Project ok.
General Inspection3/7/20173/7/20173/7/2017 PASS
DetailsMelissa Jannusch
No ESC violations. Final landscaping not yet achieved
Tracking Control2/13/20172/20/20172/21/2017PPASS
DetailsMelissa Jannusch
Okay.
General Inspection2/13/20172/13/20172/13/2017 PART
DetailsMelissa Jannusch
Track out onto side walk. Wattle has moved onto sidewalk. Permit sign not visible. Staked permit sign in front yard. Called RP and left a message requesting corrections
Corrections requested: Sweep up sidewalk, Re-install and/or replace perimeter wattle
Follow up scheduled: 2/20
General Inspection1/27/20171/27/20171/30/2017 PASS
DetailsMelissa Jannusch
Snow covered conditions. Building appears to be nearly complete. No track out trash contained. Have started work on lot next door will continue once conditions improve.
General Inspection1/12/20171/12/20171/17/2017 CANC
DetailsAndy J. Long
General Inspection12/28/201612/28/201612/30/2016 CANC
DetailsAndy J. Long
General Inspection12/9/201612/13/201612/20/2016ACANC
DetailsAndy J. Long
General Inspection12/7/201612/7/201612/9/2016 CANC
DetailsAndy J. Long
General Inspection11/22/201611/22/201611/25/2016 PASS
DetailsBen Livingston
waddel has been removed, new foundation being dug , there is alittle trac out but was cleaned up
General Inspection11/3/201611/3/201611/3/2016 PASS
DetailsDaryl Spivey
Waddle in place, no trackout and garbage in container............ds
General Inspection10/19/201610/19/201610/20/2016APASS
DetailsAndy J. Long
WIP. Frame is complete and stucco crew onsite. GC George onsite. Perimeter wattle installed at edge of pavement. No trackout, spills, or other issue. Trash container provided. Approved.
BMP Violation8/12/20168/15/20168/15/2016AFAIL
DetailsEvan Jenkins
Per EEJ Phone #: ###-####

Verbal correction notice to RP Charlie, to remove construction debris that laying all around the project, sweep sediment off sidewalk and install a BMP (straw waddle) along front of project. will follow up tomorrow to ensure compliance has been achieved.