Site Final | 3/8/2017 | 3/8/2017 | 3/8/2017 | A | PASS |
Melissa Jannusch
|
|
|
|
Aging Inspection | 3/7/2017 | 3/7/2017 | 3/8/2017 | | PASS |
Melissa Jannusch
|
|
|
Project is finished. Soil is stable. Okay to final
|
Aging Inspection | 1/3/2017 | 1/3/2017 | 1/4/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 11/2/2016 | 11/2/2016 | 11/2/2016 | | PASS |
Andy J. Long
|
|
|
WIP on home remodel. Access through paved alley way. No trackout. Front yard to Bannock undisturbed
|
General Inspection | 8/30/2016 | 8/30/2016 | 8/30/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on garage structure. No loose materials or discharges leaving site. RP/GC on duty , permit sign posted.
|
Site Preparation | 6/30/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
Andy J. Long
|
|
|
2:00 w/ Todd ###-####
Permit sign posted, no excavation or utility trenching of the paved alley, which will be used for access. RP/GC familiar with ESC conditions. Approved.
|