Site Final | 10/24/2016 | 10/24/2016 | 10/24/2016 | A | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. Site cleaned and downstream DI on Bend Ridge has had temp DI bag removed. All permits finaled.
|
BMP Violation | 5/26/2016 | 5/26/2016 | 5/26/2016 | A | FAIL |
Andy J. Long
|
|
|
No permit sign posted. No site preparation inspection requested.
BMP violations: Dirt left on sidewalk after excavation for foundation was done.
RP is Wood Bros., builder is Berkely Building note: haul trucks leaking oil throughout subdivision, requested increased maintenance and use of spill kits/absorbents.
|