General Inspection | 11/29/2016 | 11/29/2016 | 11/29/2016 | | PASS |
Andy J. Long
|
|
|
Exterior work and earth disturbance phase of addition complete. Yard is stabilized, no trackout or sediment runoff, no excess stockpiles or materials observed. ESC condtions satisfied.
|
DOC - Permit Finaled | 11/29/2016 | 11/29/2016 | 11/29/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/11/2016 | 11/11/2016 | 11/14/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/27/2016 | 10/27/2016 | 10/27/2016 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 5/31/2016 | 5/31/2016 | 5/31/2016 | P | PASS |
Mike Jordan
|
|
|
|