Site Final | 3/15/2017 | 3/15/2017 | 3/15/2017 | A | PASS |
Melissa Jannusch
|
|
|
Soil stable
|
Aging Inspection | 3/15/2017 | 3/15/2017 | 3/15/2017 | | PASS |
Melissa Jannusch
|
|
|
Project is finished. Okay to final.
|
Aging Inspection | 1/11/2017 | 1/11/2017 | 1/11/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 11/11/2016 | 11/11/2016 | 11/14/2016 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 5/9/2016 | 5/9/2016 | 5/9/2016 | A | PASS |
Jim Sly
|
|
|
|
Site Preparation | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | PASS |
Andy J. Long
|
|
|
Gene Phone #: ###-####-please call with an approx meet time
Large flat lot with preservation of exisiting driveway and landscaping. Low risk. RP familiar with ESC condtions. Apprvoed.
|