Aging Inspection | 12/8/2016 | 12/8/2016 | 12/8/2016 | | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. BLD finaled. Active projects in subdivison in compliance, temporary BMPs to remain installed. ESC permit finaled.
|
DOC - Permit Finaled | 12/8/2016 | 12/8/2016 | 12/8/2016 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | PART |
Andy J. Long
|
|
|
Tracey Phone #: ###-####
Corrections needed in Dropzone by CBH: 1. Street sweep Abram and Fastwater Streets 2. Sweep up plaster board that was smashed in front of home on Abrams 3. Contiue to contain and cover trash to prevent windblown litter
Permit signs posted, inlets have sediment bags installed (with the exception of the above). Designated lined washout pit provided.
Note- onsite stormwater retention for sub, no offsite discarges
|