Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberESC16-00603
StatusFinaled
Name JIM CONGER
Site Address 4450 E PARKCENTER BLVD
Project NameWarm Sprngs Cr sediment basin
Customer Number 
ePlanReviewNo
Description
See GRD permit for project description. Warms Springs Creek dam and sedimentation basin to be installed for flood and debris control for large storm events. Site preparation insepection required prior to excavation and after applicable BMPs installed.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection9/27/20179/27/20179/28/2017 PASS
DetailsAndy J. Long
Construction activity at site is complete. Retention basin has vegetated and stabilized.. Bond has been released. ESC permit conditions satisfied.
DOC - Permit Finaled9/28/20179/28/20179/28/2017PPASS
DetailsAndy J. Long
General Inspection9/12/20179/12/20179/19/2017 CANC
DetailsAndy J. Long
General Inspection8/28/20178/28/20178/28/2017 PASS
DetailsAndy J. Long
General Inspection8/11/20178/11/20178/11/2017 CANC
DetailsAndy J. Long
General Inspection7/27/20177/27/20177/28/2017 CANC
DetailsAndy J. Long
General Inspection7/12/20177/12/20177/13/2017 PASS
DetailsAndy J. Long
Detention basin complete. Permit open to monitor revegetation succession. No issues observed.
General Inspection6/27/20176/27/20176/27/2017 PASS
DetailsMelissa Jannusch
Vegetation growing. Irrigation is stil installed. No corrections requested.
General Inspection6/12/20176/12/20176/12/2017 PASS
DetailsMelissa Jannusch
Revegetation in phase. No corrections.
General Inspection5/26/20175/26/20175/26/2017 PASS
DetailsMelissa Jannusch
Revegetation nearly complete. No other ESC issues currently.
General Inspection5/11/20175/11/20175/12/2017 PASS
DetailsMelissa Jannusch
re-vegetation in progress
General Inspection4/26/20174/26/20174/28/2017 PASS
DetailsMelissa Jannusch
Some erosion occurring through channel and on bank. Overall ok. Vegetation is growing.
General Inspection4/11/20174/11/20174/11/2017 PASS
DetailsMelissa Jannusch
Vegetation is growing. Small rill from rainfall in basin.
General Inspection3/27/20173/27/20173/27/2017 PASS
DetailsMelissa Jannusch
Vegetation is beginning to grow. No ESC issues observed.
General Inspection3/10/20173/10/20173/10/2017 PASS
DetailsMelissa Jannusch
No corrections
General Inspection2/23/20172/23/20172/24/2017 PASS
DetailsMelissa Jannusch
No corrections.
General Inspection2/8/20172/8/20172/8/2017 CANC
DetailsAndy J. Long
General Inspection1/5/20171/5/20171/10/2017 CANC
DetailsAndy J. Long
General Inspection12/19/201612/19/201612/21/2016 CANC
DetailsAndy J. Long
General Inspection11/25/201611/25/201611/25/2016 PASS
DetailsAndy J. Long
Post construction vegetation in progress. No sediment runoff or erosion issues observed. Temp silt fence installed along Barber Drive will need removal upon stabilization.
General Inspection11/10/201611/10/201611/10/2016 CANC
DetailsAndy J. Long
General Inspection10/13/201610/13/201610/13/2016PPASS
DetailsAndy J. Long
Hydroseeded areas are continued to be irrigated and some growth appears to be established. All equipment and materials has been removed from site and area fenced off by barbed wire. No issues observed, will continue to monitor.
General Inspection9/29/20169/29/20169/29/2016PPASS
DetailsAndy J. Long
Sediment basin construction/grading is complete. Fanned entrance to basin is lined with rip-rap. Slopes of basin have been horizontally tracked and pressurized low impact sprinkler irrigation has been installed. Veasy Seeding Inc. onsite apply dry seed mix of 8 native species intermixed with GrowGanics soil ammendment to provide nutrients to improve growth & soil biology. Today tacifier glue will dry and sprinkling will start tomorrow. No wattles need to be installed unless erosion issues, do not want to disturb the seed mix application.

No trackout, SWPPP posted. Appproved.
General Inspection9/14/20169/14/20169/14/2016PPASS
DetailsAndy J. Long
WIP. Retention pond excavation is now complete. Banks/slopes of pond area have had topsoil applied and were horizontally tracked per BMPs and is ready for hydroseed/tacifier. Construction entrance installed, but some minor trackout needs to be cleaned. No discharges or fugitive dust.
General Inspection8/10/20168/10/20168/10/2016PPART
DetailsAndy J. Long
WIP on Warm Springs Creek retention and flood prevention dam & resevoir.

No fugitive dust, BMPs installed & permit info on site. Active haul out operation is occuring today and there is some trackout to Barber Drive despite having construction entrance.

Correction: Central Paving has sweeper unit on site and will sweep at the end of the day.
Site Preparation7/22/20167/22/20167/22/2016PPASS
DetailsAndy J. Long
Central Paving on site setting up staging area. Silt fence along bottom of site and rock construction entrance. Plan is to leave a channel through site to convey any flash flooding that could potentially occur. Currently the creek is dry. SWPPP box and ESC permit on site. Approved. eNOI is active, tracking # IDR12AM85
Site Preparation7/13/20167/14/20167/14/2016APASS
DetailsEvan Jenkins
Garry Phone #: ###-####

Permit posted along with sediment basin
Approved for construction
General Inspection1/20/20171/20/2017   
DetailsMelissa Jannusch