Aging Inspection | 11/17/2016 | 11/17/2016 | 11/17/2016 | | PASS |
Andy J. Long
|
|
|
Corrections from previous inspections completed. Construction complete, all permits finaled. ESC conditions satisfied.
|
DOC - Permit Finaled | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/18/2016 | 8/22/2016 | 8/23/2016 | P | PART |
Andy J. Long
|
|
|
Sweep up in front of project has occurred, though the unparking area for the finished duplex is a source of sandy trackout.
Lot to the noth of project, 1212 N. Lincoln has disturbed area in front of project and large stockpile from this project in backyard. RP/GC stated the lot will be new project later this Fall. Request issued to remove stockpile and sweep in front of this home in order to final this permit.
|
General Inspection | 8/17/2016 | 8/18/2016 | 8/18/2016 | P | CANC |
Andy J. Long
|
|
|
|
Tracking Control | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | FAIL |
Andy J. Long
|
|
|
Loose dirt trackout in front of house covering over half the street.
Immediate request for sweep up/cleaning. VM left to RP. Will check back for corrections.
|
Site Preparation | 5/4/2016 | 5/4/2016 | 5/4/2016 | P | PASS |
Evan Jenkins
|
|
|
Bill Phone #: ###-####
Met RP Bill onsite. Permit Posted on Chain link fence in front of flat lot. Approved for construction
|