DOC - Permit Finaled | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PASS |
Andy J. Long
|
|
|
Project complete, all permits finaled. Yard is landscaped/stabilized. Sidewalk and gutter cleaned. ESC condtions satisfied, active SFHs in progress adjacent to site.
|
Site Preparation | 5/24/2016 | 5/25/2016 | 5/25/2016 | A | PASS |
Evan Jenkins
|
|
|
Matt Phone #: ###-####
Permit posted in front of flat lot. Approved for construction
|