Site Final | 9/27/2016 | 9/27/2016 | 9/27/2016 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 9/27/2016 | 9/27/2016 | 9/27/2016 | P | PASS |
Jim Sly
|
|
|
|
Site Preparation | 7/11/2016 | 7/11/2016 | 7/11/2016 | P | PASS |
Andy J. Long
|
|
|
Brett Phone #: ###-####
Permit sign posted. Subdivision BMPs installed, including lined concrete washout. Active projects in compliance. Approved for construction.
|