Site Final | 2/9/2017 | 2/9/2017 | 2/9/2017 | P | PASS |
Melissa Jannusch
|
|
|
Part of driveway is gravel, but it is stabilized. okay to final
|
Aging Inspection | 2/8/2017 | 2/8/2017 | 2/9/2017 | | PASS |
Melissa Jannusch
|
|
|
|
Aging Inspection | 12/8/2016 | 12/8/2016 | 12/9/2016 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 6/7/2016 | 6/7/2016 | 6/7/2016 | P | PASS |
Andy J. Long
|
|
|
Permit sign postsed in window. Flat lot, paved driveway access to work area. No MS4 inlets on this section of Hansen. Approved
|
Site Preparation | 6/6/2016 | 6/7/2016 | 6/7/2016 | A | CANC |
Andy J. Long
|
|
|
Chris Phone #: ###-####
Approved to start. Will inspect in afternoon
|