General Inspection | 5/15/2017 | 5/15/2017 | 5/15/2017 | | CANC |
Andy J. Long
|
|
|
Permit finaled. Project covered under ESC16-00697 & -00698
|
DOC - Permit Finaled | 5/15/2017 | 5/15/2017 | 5/15/2017 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/28/2017 | 3/28/2017 | 3/28/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/8/2017 | 2/9/2017 | 2/9/2017 | P | PASS |
Melissa Jannusch
|
|
|
The inlet bags have been cleaned. Parking lot is now paved and being used as construction entrance. Sign is posted. Abram is clean of construction trackout only dirty from safety sand. No corrections.
|
General Inspection | 2/8/2017 | 2/8/2017 | 2/9/2017 | P | PASS |
Melissa Jannusch
|
|
|
The inlet bags have been cleaned. Parking lot is now paved and being used as construction entrance. Sign is posted. Abram is clean of construction trackout only dirty from safety sand. No corrections.
|
General Inspection | 1/24/2017 | 1/24/2017 | 1/30/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/7/2016 | 12/7/2016 | 12/8/2016 | | PASS |
Andy J. Long
|
|
|
Permit sign and SWPPP information posted for Dropzone Apartments. No significant trackout and winter safety sand is now on the road. No discharges or spills on or around site. Framing is now in progress and parking lot paved and onsite stormwater inlet installed, No corrections at this time
|
Site Preparation | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | PASS |
Andy J. Long
|
|
|
Colby Phone #: ###-####
Dropzone apartment grading and initial excavation conductied under main site permit ESC16-00696
Four 8-plex apartment buildings to be erected. Site access and parking not yet paved. Asphalt scheduled for 2nd week of November.
Reviewed ESC conditions with RP Colby, requested 4 or more trash containment bins and designated scrap wood and material staging zone with stabilized entrance. Surrounding storm drains have sediment filter bags installed for Dropzone Sub SFHs by CBH
Foundation construciton and vertical construction to start on Monday. Follow up inspection for construction entrance and washout facility on Monday 10/24 PM
|
Site Preparation | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | PART |
Andy J. Long
|
|
|
No trackout or discharges and water truck is on site for dust control.
No ESC sign or swppp posted. No site prep was requested. Warning issued and escalation pending. Voicemail left with RP/developer
|