Site Final | 5/18/2017 | 5/18/2017 | 5/18/2017 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and BLD is finaled. No ESC corrections, permit conditions satisfied.
|
Random Inspection | 3/1/2017 | 3/1/2017 | 3/1/2017 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted. No trackout from construction access, no discharges observed. No correctcions requested. WIP
|
General Inspection | 11/15/2016 | 11/15/2016 | 11/16/2016 | A | PART |
Andy J. Long
|
|
|
No site preparation inspection requested. No inlet protection installed.
Permit sign posted, no trackout or discharges. Clear to waive DI protection due to overflow potential from large drainage area from both directions of Hill Road.
Notified RP that Site Prep inspections are required for new SFHs regardless of location.
|