General Inspection | 10/30/2017 | 10/30/2017 | 10/30/2017 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 10/30/2017 | 10/30/2017 | 10/30/2017 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 9/12/2017 | 9/12/2017 | 9/13/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/28/2017 | 7/28/2017 | 7/28/2017 | | PEND |
Andy J. Long
|
|
|
Final landscaping and clean up in progress. Not yet complete. No trackout or other issues.
|
Site Final | 6/12/2017 | 6/12/2017 | 6/12/2017 | A | NR |
Andy J. Long
|
|
|
Construction activities near complete. Temp. occupancy granted. Need to complete stablization & landscaping, sweep up and clean loose dirt and construction materials in parking lot. Need to remove DI bag in onsite drainage and also
Written correction requested posted.
|
General Inspection | 6/12/2017 | 6/12/2017 | 6/12/2017 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/29/2017 | 5/29/2017 | 5/30/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/11/2017 | 4/11/2017 | 4/12/2017 | | PASS |
Andy J. Long
|
|
|
WIP. Some final landscaping and site improvements in progress. Access lanes to storages units have been paved with asphalt. No trackout or discharges. Will need to remove DI bag on private drain in front of site.
|
Random Inspection | 2/24/2017 | 2/24/2017 | 2/24/2017 | P | PASS |
Andy J. Long
|
|
|
Site stabilized with parking lot surface. Verticial construciton in progress. No violations observed.
|
General Inspection | 1/26/2017 | 1/26/2017 | 1/30/2017 | | CANC |
Andy J. Long
|
|
|
|
Conference | 11/29/2016 | 11/29/2016 | 11/29/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on storage building foundations and site paving. Perimeter curbing complete. NO trackout or discharges observed. Onsite DI has sediment bag installed. Permit posted.
|
General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 | A | PART |
Andy J. Long
|
|
|
Permit sign posted, construction entrance installed. No significant trackout, no discharges. Water truck on site but not in use at time of inspection and during surveillance.
Verbal correction request to onsite supervisor to run water truck over haul road and to hit stockpile. Driver started water truck while on site. Requested one - two loops per hours and to hit stockpiles.
Notified RP to do maintenance on DI bag.
|
Site Preparation | 8/22/2016 | 8/23/2016 | 8/23/2016 | P | PASS |
Andy J. Long
|
|
|
2 PM with Matt from Lurre Construction
Permit sign posted at entrance. RP onsite with ESC site map. All existing DIs (private & MS4) have inlet bags installed. Other BMPs include perimeter silt fence and rock construction entrance. Approved for excavation. Concrete washout to be installed prior to concrete work.
|
Site Preparation | 8/22/2016 | 8/23/2016 | 8/22/2016 | P | CANC |
Andy J. Long
|
|
|
duplicate
|
Site Preparation | 8/22/2016 | 8/22/2016 | 8/22/2016 | A | CANC |
Andy J. Long
|
|
|
data entry error. Site prep requested for 8/23
|